Other References

  • ดูผลงานทั้งหมด
  • 2015
  • 2014
  • 2013
  • 2012
  • 2011
  • 2007
  • 2006
  • 2005
Buriram Power Plus Co.,Ltd.(2015)
- TURN KEY Very Small Power Plant 9.9 MW completed with Turbine-Generator 10 MW, and Bagasse Fuel Steam Boiler 110 TPH 42 Barg 510 oC
Ruamkamlarp Power Co.,Ltd.
- MEI Supply of bagasse firing travelling grate200 TPH 42 BARG 460 °C Boiler Equipment2 UNITS
The Saharuang Co.,Ltd. (2014)
- Electrostatic Precipitator (ESP) for 120 TPH Boiler x 1 Unit
BURIRAM ENERGY COMPANY LIMITED(2014)
- TURN KEY Very Small Power Plant 9.9 MW completed with Turbine-Generator 10 MW, and Bagasse Fuel Steam Boiler 100 TPH 42 Barg 500oC
TAMAKA SUGAR INDUSTRY. (2014)
- Upgrading Bagasse Firing Boiler 80 T/H to be 110 T/H, 32 Kg/Cm2 (G) 360 oC, and Modification of Economizer System Completed with Electrostatic Precipitator (ESP)
KHONKAEN SUGAR INDUSTRY. (2013)
- Upgrading Bagasse Firing Boiler 80 T/H To be 110 T/H, 22 Kg/Cm2(G) 360oC - Modification of Economizer System for Bagasse Firing Boiler 200 T/H 22 Kg/Cm2 (G) 360OC Completed with Electrostatic Precipitator (ESP) for Boiler 200 T/H
The Saharuang Co.,Ltd. (2013)
- MEI Work of Bagasse Firing Boiler 200 t/h 45 kg/cm2 (g), 3600c Pinhole Grate Type x 1 Unit - Electrostatic Precipitator (ESP) for Boiler 50 TPH x 3 units - Electrostatic Precipitator (ESP) for 120 TPH Bagasse Boiler x 3units
Buriram Sugar Factory Co.,Ltd. (2013)
- Electrostatic Precipitator (ESP) for 120 TPH Boiler with x 1unit
TAMAKA SUGAR INDUSTRY. (2013)
- MEI Supply of Economizer system and Electrostatic Precipitator (ESP) for 120 TPH 30 kg/cm2 (g),360oc Boiler x 1 Unit. - MEI Supply of Economizer system and Electrostatic Precipitator (ESP) for 200 TPH 30 kg/cm2 (g),360oc Boiler x 1 Unit.
KHONKAEN SUGAR INDUSTRY. (2013)
- MEI Supply of Economizer system and Electrostatic Precipitator (ESP) for 80 TPH 22 kg/cm2(g), 360oc Boilers x 2 sets
KHONKAEN SUGAR POWER PLANT. (2013)
- MEI Work of Bagasse Firing travelling grate 220 TPH 70KG/CM2(g) 510oc BOILER EQUIPMENT 1 UNIT
KHON KAEN SUGAR POWER PLANT(2011-2012)
- Pin Hole Grate Steam Boiler 200 t/h, 45 Bar g/360°C x 1Unit
KHON KAEN SUGAR POWER PLANT(2011-2012)
- Traveling Grate Steam Boiler 150 TPH , 42 Bar g/460°Cx2Units
BURIRAM ENERGY COMPANY LIMITED(2011-2012)
- TURN KEY Very Small Power Plant 9.9 MW completed with Turbine-Generator 10 MW, and Bagasse Fuel Steam Boiler 85 TPH 42 Barg 510 C
HV Plas Co.,Ltd. (2007)
- Installation and commissioning of Coal Firing Hot Oil Boiler 2,000,000 kcal/hr with fuel handling and hot oil piping system.
ฺBuasommai Co.,Ltd.(2007)
- Supervisory, Supply for control equipment of boiler, ESP.
ThaiSaree Generating Co.,Ltd.(2007)
- Supervisory and commissioning of 6000 kw Condensing Steam Turbine and Generator.
Thanyakij Rice Mill – Nakhon Pathom(2007)
- Design, fabrication and installation of paddy dryer heat exchanger with piping - - Modify mechanic governor to electronic governor (woodward 505)
New Kwan Soon Lee Sugar Factory Co.,Ltd. (2007)
- Steam Boiler 80 t/h , 26 Bar g/390°C x2Units. - MEI Supply of Bagasse firing travelling grate 150TPH x2 Units.
HV Plas Co.,Ltd. (2007)
-Installation and commissioning of Coal Firing Hot Oil Boiler 2,000,000 kcal/hr with fuel handling and hot oil piping system.
HV Fila Co.,Ltd. (2006-2007)
-Installation and commissioning of Coal Firing Hot Oil Boiler 14,000,000 kcal/hr with fuel handling and hot oil piping system. – Design, fabrication and installation of hot oil piping system – Design and installation of instrumentation system – Design and fabrication of Air preheater, shell and tube heat exchanger – Commissioning whole hot oil plant
Thanyakij Rice Mill – Nakhon Pathom(2006)
–Engineering, Design work –Modify Boiler to improve more efficiency (draft and combustion system, dust collecting system) –Installation and commissioning TG 1,500 kW, Cooling tower, electrical system, interconnecting and selling to PEA
Thanyakij Rice Mill – Nakhon Pathom (2005)
- Condensing Steam Turbine and Generator 1,500 kW 6300V - China